Featured
Stonewall Harley Davidson
This 23,210 SF new dealership in Ruckersville features a comprehensive construction scope, including the foundation, walls, slab-on-grade (SOG), slab-on-metal-deck (SOMD), and a topping slab. The exposed concrete slab was designed to be part of the final flooring, utilizing a laser screed to achieve precise Ff (floor flatness) and Fl (floor levelness) for optimal performance and finish quality.
Paulist Fathers House
The Paulist Fathers House project covers 11,073 SF with a slab-on-grade design, utilizing 1,438 cubic yards of concrete. The scope includes the construction of footings, columns, walls, and a premium slab-on-grade to ensure a strong, durable foundation for the building.
Belmont Road
The Belmont Road project involves the construction of a structural roadway providing access to the Chinese Embassy's rear loading dock off Connecticut Avenue. All concrete work is designed to match the adjacent William Howard Taft Bridge, requiring specialty form liners and sandblasting of all exposed concrete. The project utilizes 622 cubic yards of concrete.